CESMD
Information for Strong-Motion Station
Lake Crowley - Hwy 395 Bridge
CGS - CSMIP Station 54730
Earthquakes recorded by this station
 
(Station Photograph - click to enlarge)(Sensor Layout - click to see PDF File)
   
Latitude 37.5733 N
Longitude 118.7390 W
Elevation (m) 2089
Site Geology Alluvium
Vs30 (m/sec) 305 (inferred)
Site Class D
Remarks/Notes Site information sources
 
No. of Spans2
Plan ShapeStraight with skew.
Total Length203' (61.9m). Bridge spans are 99' (30.2m) and 104' (31.7m) long.
Width of Deck43' (13.1m)
Construction Date1969
Instrumentation1995. 6 accelerometers on the bridge. 3 accelerometers at a free-field site.
 
Superstructure TypeContinuous concrete box girder. Diaphragm abutments.
Substructure TypeCircular concrete columns. 2 columns per bent.
Foundation TypeSpread footings.
RemarksThis bridge was instrumented under the interagency agreement between Caltrans and DOC.