| CESMD |
| Information for Strong-Motion Station |
| Oakland - Hwy 580/24 Interchange Bridge |
| CGS - CSMIP Station 58657 |
| Earthquakes recorded by this station |
| Latitude | 37.8286 N |
| Longitude | 122.2666 W |
| Elevation (m) | 24 |
| Site Geology | |
| Vs30 (m/sec) | |
| Site Class |
| No. of Spans | 36 |
| Plan Shape | Curved. |
| Total Length | 3284' (1001.0m). Bridge spans range from 68' (20.7m) to 146' (44.5m). |
| Width of Deck | 36' (11.0m), varies. |
| Construction Date | 1970 |
| Instrumentation | 1993. 6 accelerometers on the bridge. |
| Superstructure Type | Continuous concrete box girder. |
| Substructure Type | Concrete columns. 1, 2, or 3 coulmns per bent. |
| Foundation Type | Concrete piles. |
| Remarks | This bridge was instrumented under the interagency agreement between Caltrans and DOC. The bridge was retrofitted. |